View our Reserves and Resources for continuing operations.

Mineral Reserves and Resources (as at 31 December, 2023)

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 2.5 1.15 91 2.2 1.15 82
Probable Reserves 49.6 1.59 2,542 44.7 1.59 2,288
P&P Reserves 52.1 1.57 2,633 46.9 1.57 2,369
Measured Resource (incl. reserves) 2.5 1.16 92 2.2 1.16 83
Indicated Resources (incl. reserves) 70.6 1.64 3,730 62.8 1.64 3,307
M&I Resources (incl. reserves) 73.1 1.63 3,821 65.0 1.62 3,390
Inferred Resources 11.9 1.73 662 11.3 1.74 632

Houndé mine

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 10.8 0.81 282 9.2 0.81 240
Probable Reserves 36.3 1.77 2,067 31.1 1.77 1,773
P&P Reserves 47.2 1.55 2,349 40.3 1.55 2,013
Measured Resource (incl. reserves) 11.3 0.80 291 9.6 0.80 247
Indicated Resources (incl. reserves) 78.2 1.68 4,231 66.7 1.68 3,619
M&I Resources (incl. reserves) 89.5 1.57 4,522 76.3 1.57 3,866
Inferred Resources 16.4 1.60 844 14.0 1.60 718

Ity mine

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 2.1 2.81 191 1.9 2.81 172
Probable Reserves 7.6 2.96 719 6.8 2.96 647
P&P Reserves 9.7 2.93 910 8.7 2.93 819
Measured Resource (incl. reserves) 7.1 1.40 321 6.4 1.40 289
Indicated Resources (incl. reserves) 28.8 2.18 2,022 25.9 2.18 1,820
M&I Resources (incl. reserves) 35.9 2.03 2,342 32.3 2.03 2,108
Inferred Resources 7.6 3.47 851 6.9 3.47 766

Mana mine

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 17.6 1.04 589 15.8 1.04 530
Probable Reserves 35.5 2.55 2,904 31.9 2.55 2,613
P&P Reserves 53.1 2.05 3,492 47.8 2.05 3,143
Measured Resource (incl. reserves) 20.9 1.15 775 18.8 1.15 698
Indicated Resources (incl. reserves) 67.2 2.16 4,660 60.5 2.16 4,194
M&I Resources (incl. reserves) 88.2 1.92 5,436 79.4 1.92 4,892
Inferred Resources 9.1 1.87 545 8.2 1.87 491

Sabodala-Massawa mine

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves
Probable Reserves 49.8 1.69 2,714 39.9 1.69 2,171
P&P Reserves 49.8 1.69 2,714 39.9 1.69 2,171
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves) 46.2 2.04 3,026 37.0 2.04 2,421
M&I Resources (incl. reserves) 46.2 2.04 3,026 37.0 2.04 2,421
Inferred Resources 1.6 1.98 102 1.3 1.98 82

Lafigué mine

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves
Probable Reserves
P&P Reserves
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves) 18.1 1.22 707 16.3 1.22 637
M&I Resources (incl. reserves) 18.1 1.22 707 16.3 1.22 637
Inferred Resources 16.2 2.24 1,167 13.4 2.28 986
Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves
Probable Reserves 35.6 1.60 1,829 28.5 1.60 1,463
P&P Reserves 35.6 1.60 1,829 28.5 1.60 1,463
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves) 46.0 1.57 2,318 36.8 1.57 1,854
M&I Resources (incl. reserves) 46.0 1.57 2,318 36.8 1.57 1,854
Inferred Resources 4.6 1.67 245 3.6 1.67 196

Kalana project

Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves
Probable Reserves
P&P Reserves
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves)
M&I Resources (incl. reserves)
Inferred Resources 3.4 7.69 841 3.1 7.69 757
Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves
Probable Reserves
P&P Reserves
Measured Resource (incl. reserves)
Indicated Resources (incl. reserves) 70.9 1.97 4,494 70.9 1.97 4,494
M&I Resources (incl. reserves) 70.9 1.97 4,494 70.9 1.97 4,494
Inferred Resources 2.9 1.91 176 2.9 1.91 176
Current as at 31 December, 2023 On a 100% basis On an attributable basis
Resources shown inclusive of Reserves Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Tonnage
(Mt)
Grade
(Au g/t)
Content
(Au koz)
Proven Reserves 33.0 1.09 1,152 29.1 1.09 1,022
Probable Reserves 214.4 1.85 12,775 182.9 1.86 10,956
P&P Reserves 247.4 1.75 13,927 212.0 1.76 11,978
Measured Resource  41.8 1.10 1,479 37.0 1.11 1,316
Indicated Resources  426.0 1.84 25,188 376.9 1.84 22,346
M&I Resources  467.8 1.77 26,667 413.9 1.78 23,662
Inferred Resources 73.7 2.29 5,433 64.6 2.31 4,804

The mineral Reserves and Resources were estimated as at 31 December 2023 in accordance with the provisions adopted by the Canadian Institute of Mining Metallurgy and Petroleum (CIM) and incorporated into the NI 43-101. The Qualified Persons responsible for the mineral Reserve and Resource estimates are detailed in the following tables.

MINERAL RESOURCES

QUALIFIED PERSON POSITION PROPERTY/DEPOSIT
Kevin Harris, CPG VP Resources, Endeavour Mining plc Ity (Collin Sud, Le Plaque, Mont Ity/Walter, Bakatouo, ZiaNE, Verse Ouest-Teckraie, Aires, West Flotouo, Yopleu; Bakatouo NW, Verse East); Hounde (Dohoun, Kari Pump), Sabodala/Massawa; Bantou, Assafou, Mana (Fofina, Yaho, Filon 67, Fobiri, Yama), Nabanga
Helen Oliver, FGS, CGeol Group Resource Geologist, Endeavour Mining plc Hounde (Kari West, Kari Center-South, Vindaloo South, Dafra, Vindaloo SE); Kalana (Kalanko); Mana (Maoula); Massawa (Bambaraya, Kiesta, Niakafiri East)
Joseph Hirst, FGS, CGeol. Resource Geologist, Endeavour Mining plc Mana (Wona-Kona UG, Siou UG
Janine Fleming, SACNASP, GSSA Senior Mineral Resource Manager, Endeavour Mining plc Houndé (Golden Hill)
Mark Zammit, MAIG Principal, Cube Consulting Pty Ltd Ity (Daapleu, Gbeitouo)
Dr. Lucy Roberts, AusIMM (CP) Principal Consultant, SRK Consulting (UK) Ltd Fetekro (Lafigué)
Paul Blackney, MAusIMM, MAIG Executive Consultant, Datamine Australia Pty. Ltd. (Snowden Optiro)

Kalana

MINERAL RESERVES

QUALIFIED PERSON POSITION PROPERTY/DEPOSIT
Salih Ramazan, FAusIMM Vice President, Mine Planning, Endeavour Mining plc Ity, Houndé, Sabodala-Massawa (OP)
Bryan Pullman, P.Eng Principal Mining Engineer – Mining Advisory, SLR (UK) Sabodala UG
John R. Walker, FGS, FIMMM, FIQ Technical Director, Mining Advisory​, Mining Advisory SLR (UK) Mana (UG)
Francois Taljaard Principal Consultant, Mining Engineering, SRK Consulting (UK) Ltd Fetekro (Lafigué)
Allan Earl, FAusIMM Executive Consultant, Snowden Mining Industry Consultants (Pty) Ltd Kalana
  1. The mineral resources and mineral reserves have been estimated and reported in accordance with Canadian National Instrument 43-101, 'Standards of Disclosure for Mineral Projects' and the CIM Definition Standards adopted by CIM Council on 10 May 2014, as well as the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines as also adopted on 29 November 2019.
  2. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
  3. All mineral resources are reported inclusive of mineral reserves.
  4. Tonnages are rounded to the nearest 100,000 tonnes; gold grades are rounded to two decimal places; ounces are rounded to the nearest 1,000oz. Rounding may result in apparent differences between tonnes, grade and contained metal.
  5. Tonnes and grade measurements are in metric units; contained gold is in troy ounces.
  6. Processing recoveries vary at each pit by many factors including material types, mineralogy and chemistry of the ore. The overall average recoveries are around 89% at Sabodala, 90% at Houndé, 85% at Ity, and 88% at Mana. The average processing recoveries at the development projects is Lafigué at 95%, Kalana at 90% and Assafou at 90%.
  7. The three Golden Hill exploration permits held by Boss Minerals SARL, expired on 2 March 2021 and are non-renewable. The Company has applied for the granting of two of the three historical exploration permits under Birimian Resources SARL. As of 31 December 2023, both of the applications are still pending.
  8. The Assafou project is currently 100% owned. Ownership (and attributable Mineral Resource and Mineral Reserves) will change to 90% once an exploitation permit is granted.  
  9. The reporting of mineral reserves and resources are based on a gold price as detailed below:
Au Price $/oz Houndé Ity Mana Sabodala-
Massawa
Lafigué Assafou Kalana
2023 Reserves 1,300 1,300 1,300 1,300 1,300 - 1,500
2022 Reserves 1,300 1,300 1,300 1,300 1,300 - 1,500
2023 Resources 1,500
1,8001
1,500 1,500 1,500 1,500 1,500 1,500
2023 Resources 1,500
1,8001
1,500 1,500 1,500 1,500 1,500 1,500

1 Golden Hill resources, within the Houndé mine resources are at a Gold Price of $1,500 - $1,800 per ounce. Cut-off grades for the resources are as follows:
a. Hounde: at 0.50g/t Au
b. Ity at 0.50g/t Au
c. Sabodala-Massawa: open pit from 0.31g/t to 1.00g/t Au. Underground from 2.00g/t to 2.84g/t Au
d. Mana OP: open pit for oxide at 0.41g/t Au to 0.56g/t Au, for transitional 0.44g/t Au to 0.69 g/t Au, and sulphide at 0.72g/t Au to 2.54g/t Au
e. Mana UG: Mineral Resources for Siou and Wona underground mines (72% of Mineral Resource) are reported within the constrained underground mineable shapes, generated at a cut-off grade of 2.0 g/t Au and reported above a cut-off of 1.8g/t Au for Siou and 2.0 g/t Au at Wona; the differential between the reported grade of 1.8 g/t Au and the constrained shape grade of 2.0 g/t Au contributes a non-material (2%) of additional ounces at Siou. 
f. Lafigué: oxide at 0.40g/t Au, transitional and fresh at 0.50g/t Au
g. Kalana: all 0.50g/t Au
h.Bantou: from 0.43g/t Au to 0.86g/t Au
i. Nabanga: at 3.00g/t Au
j. Golden Hill: from 0.49g/t to 0.55g/t Au
k. Assafou: at 0.50g/t Au

Cut-off grades for the reserves are as follows:
a. Houndé: oxide: 0.50g/t Au to 0.70g/t Au; transitional: 0.50g/t Au to 0.08g/t Au; fresh: 0.50g/t Au to 0.60g/ except Mambo fresh 0.90g/t Au
b. Ity: oxide: 0.50g/t Au to 0.60g/t Au; transitional: 0.40g/t Au to 0.90g/t Au; fresh: 0.40g/t Au to 0.90g/t Au
c. Sabodala Open Pit WOLP: oxide: 0.60/t Au to 0.70g/t Au; transitional: 0.60g/t Au to 0.80g/t Au; fresh: 0.60g/t Au to 0.80g/t Au
d. Sabodala Open Pit SLP: Oxide: NA; Transitional NA; RedTran: 1.10g/t Au to 1.40g/t Au; fresh 1.30g/t Au to 1.40g/t Au
e. Sabodala UG: 2.82g/t Au
f. Mana OP: Not Applicable
g. Mana UG: Mineral Reserve estimation for both Wona and Siou, was based on the constrained underground shapes generated at a gold cut-off grade of 2.4 g/t, a gold price of USD 1300/oz, and the mine and mill production schedules
h.
i. Wahgnion: oxide: 0.40g/t Au to 0.50g/t Au; transitional: 0.50g/t Au to 0.60g/t Au; fresh: 0.50g/t Au to 0.60g/t Au
j. Lafigué: 0.40g/t Au
k. Kalana and Kalanako pits: oxide: 0.40g/t Au; transitional: 0.50g/t Au; fresh: 0.60g/t Au, 0.5g/t Au for TSF

The reserve estimation study has been carried out internally for Ity, Hounde, and Mana, and Sabodala. The most recent Lafigué study was carried out by SRK Consulting and Lycopodium and the Kalana study was carried out by Snowden. 

The Technical Reports published so far are available electronically on SEDAR at www.sedar.com under the Corporation's profile. The Sabodala-Massawa Mine, and Golden Hill Project Technical Reports are available under the Teranga Gold profile on SEDAR. The Mana Mine, Bantou Project and Nabanga Project reports are available under the SEMAFO profile on SEDAR. 

  • Ity mine: "Technical Report on the Ity Gold Mine, Republic of Cote d'Ivoire", dated 15 June, 2020. 
  • Houndé mine: "Houndé Gold Mine Technical Report, 2020", dated 15 June, 2020.
  • Mana Mine: "Mana Property, Burkina Faso NI 43-101 Technical Report “, dated 31 December, 2017.
  • Bantou Project: "Bantou Project, NI 43-101 Technical Report – Mineral Resource Estimate”, dated 3 April, 2020.
  • Nabanga Project: "Nabanga Project, NI 43-101 Report – Preliminary Economic Assessment”, dated 14 November, 2019.
  • Sabodala-Massawa Mine: "Sabodala-Massawa Project Technical Report Update National Instrument 43-101 Technical Report”, dated 9 May, 2022.
  • Golden Hill Project (shown under Houndé): "Technical Report on the Golden Hill Project, Burkina Faso, NI 43-101 Report”, dated 17 December, 2020.
  • Lafigué Project: Reserves and Resources were updated in June 2022 and published in "Lafigué Project, Côte d’Ivoire NI 43-101 Technical Report Definitive Feasibility Study (DFS)", on 30 November, 2022. 
  • Kalana Project: Reserves and Resources were updated in early 2021 and published in "Kalana Gold Project, Republic of Mali Pre-Feasibility Study National Instrument 43-101 Technical Report" on 9 April, 2021.