View our Reserves and resources for continuing operations.
Mineral Reserves and resources (as at 31 December 2024)1
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 2.6 | 1.06 | 90 | 2.4 | 1.06 | 81 |
Probable reserves | 55.9 | 1.42 | 2,554 | 50.3 | 1.42 | 2,298 |
P&P reserves | 58.5 | 1.41 | 2,643 | 52.6 | 1.41 | 2,379 |
Measured resources | 2.6 | 1.07 | 91 | 2.4 | 1.07 | 82 |
Indicated resources | 64.8 | 1.53 | 3,182 | 58.3 | 1.53 | 2,864 |
M&I resources | 67.5 | 1.51 | 3,273 | 60.7 | 1.51 | 2,945 |
Inferred resources | 6.8 | 1.50 | 327 | 6.1 | 1.50 | 294 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 11.3 | 0.91 | 331 | 9.6 | 0.91 | 282 |
Probable reserves | 67.3 | 1.49 | 3,222 | 57.4 | 1.49 | 2,756 |
P&P reserves | 78.6 | 1.41 | 3,553 | 67.1 | 1.41 | 3,038 |
Measured resources | 11.4 | 0.91 | 331 | 9.7 | 0.91 | 281 |
Indicated resources | 97.8 | 1.62 | 5,093 | 83.3 | 1.62 | 4,350 |
M&I resources | 109.1 | 1.55 | 5,423 | 93.0 | 1.55 | 4,631 |
Inferred resources | 9.1 | 1.59 | 467 | 7.8 | 1.59 | 398 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 16.7 | 1.02 | 549 | 15.1 | 1.02 | 494 |
Probable reserves | 33.9 | 2.49 | 2,711 | 30.5 | 2.49 | 2,439 |
P&P reserves | 50.7 | 2.00 | 3,260 | 45.6 | 2.00 | 2,934 |
Measured resources | 19.9 | 1.13 | 724 | 17.9 | 1.13 | 651 |
Indicated resources | 60.5 | 2.29 | 4,463 | 54.5 | 2.29 | 4,017 |
M&I resources | 80.4 | 2.01 | 5,186 | 72.4 | 2.01 | 4,668 |
Inferred resources | 20.4 | 2.01 | 1,322 | 18.4 | 2.01 | 1,190 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 1.1 | 2.88 | 100 | 1.0 | 2.88 | 90 |
Probable reserves | 6.5 | 2.77 | 577 | 5.8 | 2.77 | 520 |
P&P reserves | 7.6 | 2.79 | 678 | 6.8 | 2.79 | 610 |
Measured resources | 3.0 | 3.51 | 334 | 2.7 | 3.51 | 300 |
Indicated resources | 13.0 | 3.32 | 1,388 | 11.7 | 3.32 | 1,249 |
M&I resources | 15.9 | 3.36 | 1,721 | 14.3 | 3.36 | 1,549 |
Inferred resources | 8.5 | 3.51 | 959 | 7.6 | 3.51 | 863 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | – | – | – | – | – | – |
Probable reserves | – | – | – | – | – | – |
P&P reserves | – | – | – | – | – | – |
Measured resource | – | – | – | – | – | – |
Indicated resources | 18.1 | 1.22 | 707 | 16.3 | 1.22 | 637 |
M&I resources | 18.1 | 1.22 | 707 | 16.3 | 1.22 | 637 |
Inferred resources | 16.2 | 2.24 | 1,167 | 13.4 | 2.28 | 986 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 3.0 | 0.94 | 90 | 2.4 | 0.94 | 72 |
Probable reserves | 41.4 | 1.70 | 2,267 | 33.1 | 1.70 | 1,813 |
P&P reserves | 44.4 | 1.65 | 2,357 | 35.5 | 1.65 | 1,885 |
Measured resources | 3.0 | 0.94 | 90 | 2.4 | 0.94 | 72 |
Indicated resources | 43.2 | 2.03 | 2,813 | 34.6 | 2.03 | 2,250 |
M&I resources | 46.2 | 1.95 | 2,903 | 36.9 | 1.95 | 2,322 |
Inferred resources | 4.0 | 1.38 | 177 | 3.2 | 1.38 | 142 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | – | – | – | – | – | – |
Probable reserves | 35.6 | 1.60 | 1,829 | 28.5 | 1.60 | 1,463 |
P&P reserves | 35.6 | 1.60 | 1,829 | 28.5 | 1.60 | 1,463 |
Measured resources | – | – | – | – | – | – |
Indicated resources | 46.0 | 1.57 | 2,318 | 36.8 | 1.57 | 1,854 |
M&I resources | 46.0 | 1.57 | 2,318 | 36.8 | 1.57 | 1,854 |
Inferred resources | 4.6 | 1.67 | 245 | 3.6 | 1.67 | 196 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | – | – | – | – | – | – |
Probable reserves | – | – | – | – | – | – |
P&P reserves | – | – | – | – | – | – |
Measured resources | – | – | – | – | – | – |
Indicated resources | – | – | – | – | – | – |
M&I resources | – | – | – | – | – | – |
Inferred resources | 3.9 | 6.91 | 868 | 3.5 | 6.91 | 781 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | – | – | – | – | – | – |
Probable reserves | 72.8 | 1.76 | 4,115 | 72.8 | 1.76 | 4,115 |
P&P reserves | 72.8 | 1.76 | 4,115 | 72.8 | 1.76 | 4,115 |
Measured resources | – | – | – | – | – | – |
Indicated resources | 73.6 | 1.95 | 4,604 | 73.6 | 1.95 | 4,604 |
M&I resources | 73.6 | 1.95 | 4,604 | 73.6 | 1.95 | 4,604 |
Inferred resources | 3.3 | 1.97 | 208 | 3.3 | 1.97 | 208 |
Current as at 31 December 2024 | On a 100% basis | On an attributable basis | ||||
---|---|---|---|---|---|---|
Resources shown inclusive of reserves | Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Proven reserves | 34.8 | 1.04 | 1,160 | 30.4 | 1.04 | 1,019 |
Probable reserves | 313.3 | 1.71 | 17,274 | 278.5 | 1.72 | 15,405 |
P&P reserves | 348.1 | 1.65 | 18,434 | 308.9 | 1.65 | 16,424 |
Measured resources | 39.8 | 1.23 | 1,569 | 35.0 | 1.23 | 1,386 |
Indicated resources | 417.0 | 1.83 | 24,567 | 369.0 | 1.84 | 21,825 |
M&I resources | 456.8 | 1.78 | 26,136 | 404.0 | 1.79 | 23,211 |
Inferred resources | 76.8 | 2.33 | 5,740 | 67.0 | 2.35 | 5,058 |
- Reserves and resources are shown for continuing operations. The mineral reserves and resources were estimated as at December 31, 2024 with the provisions adopted by the Canadian Institute of Mining Metallurgy and Petroleum (CIM) and incorporated into the NI 43-101. The Qualified Persons responsible for the mineral reserve and resource estimated are detailed in the following tables.
MINERAL RESOURCES
QUALIFIED PERSON | POSITION | PROPERTY/DEPOSIT |
---|---|---|
Kevin Harris, CPG | VP Resources, Endeavour Mining plc | Ity; Houndé (Dohoun, Kari Pump, Vindaloo), Sabodala/Massawa (all except Bambaraya, Kiesta, Niakafiri East, Niakafiri West, Masoto, Mammasoto, Kawsara), Bantou, Assafou Project, Lafigué |
Helen Oliver, FGS, CGeol | Group Resource Geologist, Endeavour Mining plc | Hounde (Kari West, Kari Center-South, Vindaloo South, Dafra, Vindaloo SE, Koho, Mambo); Kalana (Kalanko); Sabodala-Massawa (Bambaraya, Kiesta, Niakafiri East, Niakafiri West, Kerekounda East, Soukhoto, Delya, Tina, Samina, Kawsara) |
Joseph Hirst, FGS, CGeol |
Resource Geologist, Endeavour Mining plc |
Mana (Wona-Kona UG, Siou UG); Sabodala/Massawa(Masoto, Mammasoto, Sofia), Nabanga |
Paul Blackney, MAusIMM, MAIG | Executive Consultant, Datamine Australia Pty. Ltd. (Snowden Optiro) | Kalana deposit |
MINERAL RESERVES
QUALIFIED PERSON | POSITION | PROPERTY/DEPOSIT |
---|---|---|
Salih Ramazan, FAusIMM | Vice President, Mine Planning, Endeavour Mining plc | Ity, Houndé, Sabodala-Massawa (OP), Assafou Project, Lafigué |
John R. Walker, FGS, FIMMM, FIQ |
Technical Director - Mining Advisory SLR |
Mana (Wona-Kona UG, Siou UG) |
David M Robson, PEng MBA |
Principal Mining Engineer - Mining and Mining Advisory Group - SLR |
Sabodala-Massawa (Golouma and Kerekounda UG) |
Allan Earl, FAusIMM |
Executive Consultant, Datamine Australia Pty. Ltd. (Snowden Optiro) |
Kalana project |
- The mineral resources and mineral reserves have been estimated and reported in accordance with Canadian National Instrument 43-101, 'Standards of Disclosure for Mineral Projects' and the CIM Definition Standards adopted by CIM Council on 10 May 2014, as well as the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines as also adopted on 29 November 2019.
- Mineral resources that are not mineral reserves do not have demonstrated economic viability.
- All mineral resources are reported inclusive of mineral reserves.
- Tonnages are rounded to the nearest 100,000 tonnes; gold grades are rounded to two decimal places; ounces are rounded to the nearest 1,000oz. Rounding may result in apparent differences between tonnes, grade and contained metal.
- Tonnes and grade measurements are in metric units; contained gold is in troy ounces.
- Processing recoveries vary and are a function of many factors including: pit material types, mineralogy and chemistry of the ore. The overall average recoveries are around 89% at Sabodala, 90% at Houndé, 87% at Ity, 88% at Mana, and 95% at Lafigué. The average processing recoveries at the development projects is Kalana at 90% and Assafou at 90%.
- The Assafou project is currently 100% owned. Ownership (and attributable Mineral Resource and Mineral Reserves) will change to 90% once an exploitation permit is granted.
- The reporting of mineral reserves and resources are based on a gold price as detailed below:
Au Price $/oz | 2024 Reserve | 2023 Reserve | 2024 Resource | 2023 Resource |
---|---|---|---|---|
Houndé | 1,500 | 1,300 | 1,900 | 1,500 |
Ity | 1,500 | 1,300 | 1,900 | 1,500 |
Mana | 1,500 | 1,300 | 1,900 | 1,500 |
Sabodala-Massawa | 1,500 | 1,300 | 1,900 | 1,500 |
Lafigué | 1,500 | 1,300 | 1,900 | 1,500 |
Kalana | 1,500 | 1,500 | 1,900 | 1,500 |
Assafou | 1,500 | – | 1,900 | 1,500 |
Cut-off grades for the resources are as follows:
a. Houndé: at 0.50g/t Au
b. Ity at 0.50g/t Au
c. Sabodala-Massawa: open pit from 0.31g/t to 1.00g/t Au. Underground from 2.00g/t to 2.84g/t Au
d. Mana OP: open pit for oxide at 0.41g/t Au to 0.56g/t Au, for transitional 0.44g/t Au to 0.69 g/t Au, and sulphide at 0.72g/t Au to 2.54g/t Au
e. Mana UG: Mineral Resources for Siou and Wona underground mines (72% of Mineral Resource) are reported within the constrained underground mineable shapes, generated at a cut-off grade of 2.0 g/t Au and reported above a cut-off of 1.8g/t Au for Siou and 2.0 g/t Au at Wona; the differential between the reported grade of 1.8 g/t Au and the constrained shape grade of 2.0 g/t Au contributes a non-material (2%) of additional ounces at Siou
f. Lafigué: oxide at 0.40g/t Au, transitional and fresh at 0.50g/t Au
g. Kalana: all 0.50g/t Au
h. Bantou: from 0.43g/t Au to 0.86g/t Au
i. Nabanga: at 3.00g/t Au
j. Assafou: at 0.50 g/t Au
Cut-off grades for the reserves are as follows:
- Houndé: oxide: 0.40g/t Au to 0.60g/t Au; transitional: 0.40g/t Au to 0.70g/t Au; fresh: 0.40g/t Au to 0.70g/t except Mambo fresh 1.00g/t Au
- Ity: oxide: 0.40g/t Au to 0.50g/t Au; transitional and fresh: 0.40g/t Au to 0.80g/t Au
- Sabodala Open Pit WOLP: oxide: 0.50/t Au to 0.60g/t Au; transitional: 0.0g/t Au to 0.70g/t Au; fresh: 0.50g/t Au to 0.89g/t Au
- Sabodala Open Pit STP: RedTran: 1.00g/t Au to 1.60g/t Au; fresh: 1.20g/t Au to 1.30g/t Au
- Sabodala UG: 2.55g/t Au for Golouma and 2.48g/t for Kerekounda
- Mana UG: Mineral Reserve estimation for both Wona and Siou was based on the constrained underground shapes generated at a gold cut-off grade at Wona of 2.60 g/t, Siou South 2.90g/t and Siou North 2.80g/t, at a gold price of USD 1,500/oz
- Lafigué: 0.40g/t Au
- Kalana and Kalanako pits: oxide: 0.40g/t Au; transitional: 0.50g/t Au; fresh: 0.60g/t Au, 0.00g/t Au for TSF
- Assafou Project: laterite/oxide/transitional: 0.40g/t Au; fresh 0.50g/t Au